Large Format Low Iron Glass for Facade Glazing Projects

By lydglass November 13th, 2026 18 views

Introduction: Curtain wall contractors and project procurement managers need a facade RFQ that fixes thickness, panel size, hole positions, cutouts, edge finish and packing before tempering, when those choices become permanent product geometry.

A facade package is priced and built from a panel schedule. Every dimension must be settled before the glass enters the tempering furnace. Curtain wall contractors and project procurement managers turn elevations into a request a fabricator can quote: thickness, panel size, hole positions, cutouts, edge finish and crate layout. Each item needs a number, and each number must survive the trip from drawing to site. Tempered glass is finished when it leaves the furnace. It cannot be cut, drilled or ground afterward. A missed hole does not become a site fix; it becomes a replacement panel. Getting the RFQ right the first time is the cheapest quality control available on a facade job.

How Facade Exposure and Panel Size Influence Low Iron Glass Specification

A facade panel carries wind load, flexes within deflection limits and absorbs solar heat on one face while the shaded edge stays cooler. Facade glazing is therefore designed against wind-load and deflection criteria rather than chosen from a catalogue. FGIA publishes standards and design guides that curtain wall engineers use, and those documents settle the thickness question before price is discussed. Panel size then reshapes the specification. A 3660 mm by 2440 mm sheet covers more elevation with fewer joints, which means fewer perimeter seals, fewer alignment problems and a more efficient install sequence. The trade-off is weight: a large panel needs heavier lifting equipment, stronger racking and a crate plan that matches the order of installation. Thickness usually climbs with panel span and exposure, so lower vision units may run 8 mm while taller or more exposed units move to 10 mm, 12 mm or heavier. A 4 mm to 19 mm thickness range lets a project specify common facade thicknesses within one processing setup and avoid splitting the package between suppliers. Low iron also matters. On a facade, panel edges sit side by side along every joint, and the green tint of ordinary float glass becomes obvious across a large elevation. Ultra clear low iron tempered glass reduces that tint and can transmit 91% or more visible light, so the wall reads as one continuous surface.

What to Include in a Large Format Facade Glazing RFQ

An RFQ that says only "10 mm low iron tempered, per drawing" invites assumptions, and assumptions cost facade jobs time. The request must be specific enough for a fabricator to price real processing rather than guess. Two areas need particular care: the panel schedule with dimensions and thickness, and the hole and cutout drawing that will be loaded into the waterjet table.

1. Which Panel Dimensions and Thickness Range Should a Facade RFQ State

List every panel with its mark, finished width and height, thickness and quantity. Confirm whether dimensions are finished sizes or nominal ones. A 12 mm panel ordered to the wrong reference will not fit the opening no matter how well it is made. The processing envelope is 3660 mm by 2440 mm, so any panel approaching that limit needs drawing review before the quote is issued; a panel beyond it must be split or the facade detail redesigned. State the edge requirement for each panel, including whether exposed edges need a flat polished finish. Also state corner treatment, because square, chamfered and radiused corners are different cutting programs. A schedule that carries all of this in one table of panel marks lets a low iron tempered glass manufacturer quote the actual processing, not a range.

2. How Hole and Cutout Drawings Should Be Prepared Before Tempering

Every hole, notch, cutout and shaped edge must be in the drawing before the panel is tempered. Waterjet drilling, cutouts and shaped cutting run from the supplied drawing, so the drawing must be complete and unambiguous. Define a datum edge for setting out, then give hole diameter, position from the datum, spacing between holes, cutout dimensions and corner radii. Mark the setting-out reference edge and the exterior face, because fixing hardware is not symmetrical. Supply the file at 1:1 in DXF with a matching PDF and a panel schedule whose marks tie back to the elevations. Keep the approved drawings on file; they become the record for repeat orders and replacement panels later, when nobody remembers which revision was built.

How Pre-Tempered Drilling, Cutouts and Edge Finishing Support Facade Installation

The processing order is fixed: cut to size, finish the edge, drill and cut out, then temper. Tempering locks a stress pattern into the glass and makes the panel a safety glass. It also freezes the geometry. All holes and cutouts must be completed before tempering, and finished tempered glass cannot be cut, drilled or ground again. A fabricator's drawing review is the last practical point to catch a conflict between a hole and a bracket while the panel is still annealed. For installation, the pre-tempering stage is what allows hardware to fit. Fixing hardware and brackets arrive on site with their own tolerances, and the glass hole has to absorb the stack-up between them. Hole diameter, hole-to-edge distance and spacing between adjacent holes all affect how the panel behaves under load, so their positions belong in drawing review rather than a site conversation. Edge finishing works the same way. A flat polished edge helps remove the small chips and micro-cracks that can become crack origins under thermal or mechanical stress, and it gives a clean line wherever an edge stays visible. Packing follows the panel schedule. Panels can be packed in plywood crates or A-steel racks, with crate marks tied to panel marks so the site can receive them in the planned order. As an ultra clear glass supplier, we keep drawing records so a repeat order reproduces the same hole positions rather than a near match.

Conclusion

A facade glazing package depends on decisions made long before shipment: the thickness that handles the exposure, the panel size that fits the processing envelope, and the holes and cutouts locked into the drawing before tempering. Settle those three items and the quote becomes comparable, the crates arrive in a usable order, and the install crew spends its time setting panels instead of solving surprises. Send us your panel schedule with marks, dimensions and thickness, along with the hole and cutout drawings and your packing preference. We will review the maximum panel size and hole layout against the drawing and respond with a processing plan and quote.

FAQ

Q: What details should a facade glazing RFQ include for large format low iron tempered glass?

A: Include a per-panel schedule with marks, finished width and height, thickness, quantity and edge requirement. Add hole and cutout drawings with a defined datum edge, packing preference, crate marking scheme and destination port. This combination lets the fabricator review the layout, confirm the panel size fits the 3660 mm by 2440 mm processing envelope, and quote the actual job.

Q: Can ultra clear toughened glass be produced with waterjet holes before tempering?

A: Yes. Waterjet drilling, cutouts and shaped cutting are completed while the glass is still annealed, before it enters the tempering furnace. Holes, notches and shaped edges are cut from your drawing, and the panel is then tempered as a finished piece. Because tempered glass cannot be drilled or cut afterward, every mechanical feature must be approved at that stage.

Q: What is the maximum panel size available for large format low iron facade glass?

A: The maximum processed size is 3660 mm by 2440 mm, within a thickness range of 4 mm to 19 mm. Panels close to that limit still need drawing review to confirm handling, hole positions and crate layout. Anything larger must be split or the facade detail redesigned before quoting.

Sources / References

FGIA Standards and Publications

EN 12150-1:2015 Thermally Toughened Soda Lime Silicate Safety Glass

Related Examples

Ultra Clear Low Iron Tempered Glass for Architectural Projects

Previous
Custom Low Iron Tempered Glass for Street-Level Shopfronts
Read More
Next
Tempered Glass Export Packaging and Shipment Planning from Xingang Port
Read More

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
FirstName *
Email *
WhatsApp *
Message *
Please tell us the following information about your requirements: product model (product series), size, quantity
Leave a message
FirstName *
Email *
WhatsApp *
Message *
Please tell us the following information about your requirements: product model (product series), size, quantity
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.